Hardens and seals the surface of concrete floors and provides a dust proof dressing
that gives increased floor life.
Surfaces should be free of loose particles and dust.
Allow new floor to cure prior to application for 28 days.
Saturate surface and allow to dry for 24 hours.
Avoid ponding of surfaces.
Apply second coat then after 1 to 2 hours wash excess material away to avoid a white
deposit forming.
Application Rates: 5 litres of product will cover approximately 20m² or in general use 5 to 10 litres per